Mail us for help:
info@bilmahdenergy.com
(Mon- Friday)
(Mon- Friday)
Mail us for help:
info@bilmahdenergy.com
Texas, USA
01.
Supply, Installation & Construction
We successfully delivered the supply, installation, and construction of manifold and flowline valves at the Oredo Production Facilities in OML 111, Benin, for NPDC/NNPCL. This project showcased our capability to execute complex oil and gas infrastructure works, enhancing operational efficiency, ensuring safe hydrocarbon flow, and reinforcing the reliability of the facility through strict adherence to industry standards.
02.
Supply, Installation & Construction
We successfully executed the supply, installation, and construction of manifold and flowline valves, along with the engine room bulkhead, at OML 119 Mystra for NPDC/NNPCL in 2021. This project demonstrated our expertise in delivering integrated oil and gas infrastructure solutions, improving system integrity, operational safety, and overall facility performance in line with industry standards.
03.
Construction of Mini Filling Station
We successfully carried out the construction of a mini filling station at the NGC/NNPCL metering station within the Egbin Power Plant in 2022. The project highlighted our capability to deliver safe and efficient downstream infrastructure, supporting fuel accessibility, operational convenience, and compliance with industry and safety standards.
04.
Supply of Automotive Gas Oil (AGO)
We successfully executed the supply of Automotive Gas Oil (AGO) to OML 123 and 126 offshore fields for Antan Producing Limited/NNPCL in 2024. This project demonstrated our strength in reliable fuel logistics and offshore supply chain operations, ensuring uninterrupted production activities through timely delivery, operational efficiency, and strict adherence to industry standards.
05.
Installation and Construction
We successfully carried out the installation and construction of erosion control repairs along the Njaba pipeline right-of-way at Antan Producing Limited’s facilities in Izombe in 2024. The project reinforced pipeline integrity, mitigated environmental risks, and ensured continued operational reliability through the application of effective engineering solutions and strict compliance with industry standards.
06.
Construction and Renovation
We successfully executed the construction and renovation of PTU accommodation upgrades across OML 123 and 126 offshore facilities for Antan Producing Limited/NNPCL in 2025. The project enhanced living standards, improved safety and functionality, and delivered durable, high-quality accommodation solutions tailored to offshore operational needs in line with industry standards.
(Mon- Friday)
Mail us for help:
info@bilmahdenergy.com
Texas, USA